-
Fri, 26th Mar 2010, 12:10 AM
#5
The plumbing is 1in. As for changing the plumbing, I have no intention of doing so, Just wanted to make it known I knew about the 3 over flow methods to eliminate those suggestions. LOL Call it a preemptive strike if you will. As for the rigid tubing how would one put that in since the overflows go through the back of the tank? You suggesting a T on the back of the bulkhead and capping the top and then drilling a hole to insert tubing into?
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules