UPCOMING: Events

Results 1 to 10 of 23

Thread: First Saltwater Adventure- 90 Gallon Build Thread

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #23

    Default

    Ahh, one year later and finally getting around to finishing this. I am indeed setting a new record for going slow.

    Inside: Cover Stain primer topped with S/W Ultra-White alkyd.




    Faceframe assembled and attached. Alder on birch ply. Just bisquits attaching this to the box.




    Same for the top with the addition of a hole for the sump. Rounded over the edges with the trusty Bosch router and a 3/8" round-over.




    Trimmed out. Tried a little aspen this time on the trim. It's kinda fuzzy when cut but it's forgiving to work with. A couple of doors and about 9 coats of black laquer and it'll be ready to plumb.

    Last edited by opium89; Sat, 6th Mar 2010 at 09:41 PM.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •