-
Thu, 18th Dec 2008, 03:36 PM
#8
haha, sorry. I did everything off the top of my head. It only hurt me in two places:
1) When I changed my mind to go from 1" pipe to 2" pipe after finding a 2" bulkhead in a bucket, re-drilled the input hole and realized I drilled too close to the side walls and now couldn't put the bulkhead flange on and had to put a false top on the skimmer box.
2) Cut the flange for the bottom tube too small so the plastic screws wouldn't fit because the heads were too wide and the top tube got in the way so I had to glue a bigger flange on top of the smaller one and re-do the flange on the top tube to match. The only reason I even had that flange is because I found a piece of 6" acrylic tube already cut from the last time I did this and thought it would be nice to use it.
Last edited by Joshua; Thu, 18th Dec 2008 at 03:40 PM.
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules