so sequence would be (current lights)
65 blue + actinic = 1st switch 1 hour before
10,000 k + 50/50 = 2nd switch
how long should i leave the light running?
thanks
so sequence would be (current lights)
65 blue + actinic = 1st switch 1 hour before
10,000 k + 50/50 = 2nd switch
how long should i leave the light running?
thanks