Sheesh. You guys must have a lot more time on your hands than I do.I would post another pic of it sitting there full of tapwater, but I think that would be kind of boring.
Right now, the plumbing is done, so I have to vacuum up all the sand and gunk at the bottom, in preparation for my bare-bottom. Then, I have to re-sand and paint the canopy. After that I have to install the lights. Next, I fill it with RO/DI water and salt. After all that is done, I can actually test my skimmer.
That is about a month's worth of work to me. Once all that is done I can start curing live rock, which will probably be another 2 months.
Pretty boring, I know. :(



I would post another pic of it sitting there full of tapwater, but I think that would be kind of boring.
Reply With Quote
