UPCOMING: Events

Results 1 to 4 of 4

Thread: still a bit confused

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1

    Default still a bit confused

    Hello All
    its hard for me to explain so i added a illustration to help me try to explain. http://develop.webheadgroup.com/naca/overflow_ill2.htm
    for the pictures in URL you will find that I am having issues with entire set up. One of my hold ups is the overflow box. If i were to drill for bulkheads do i need anything else to go with it. 1 or 2 pipes. (clogging issues, etc.) Please take a look at the illustrations and thanks for your time and advice. - E!

    p.s since all will be internal (in walls) right time the first time, if even possible
    Last edited by Vstar99; Thu, 29th May 2008 at 11:29 AM.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •