Stephen73ta
Wed, 24th Jun 2009, 08:20 PM
Ok, so I finally got my tank up and running! It's my first tank and it took me forever.. I'm really proud of it and hopefully I won't kill any livestock. I built a majority of the stuff myself and I'll try to show you how I did it.
Here is what I started with.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/IMG00092.jpg
You will have to excuse me I accidentally deleted a lot of the construction pics of the stand. Here is what I have.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/IMG00109.jpg
After I got the sides up I painted the stand with primer and then semi gloss black paint. Here I cut holes in the back for plumbing and the side for fans.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0024-1.jpg<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0044-1.jpg
Here's the fans installed.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0083-1.jpg
<br>
I also added this air vent.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0192-1.jpg
<br>
Doors and Bracket.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0063-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0073-1.jpg
<br>
Finished Product.. Well, atleast that's what I thought..
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0182-1.jpg
I ended up having to drill 4 more holes on the back two for the 3/4" inlet and return on the closed loop and two holes on the bottom left for electrical use..
I must say the planning of the sump/fuge and plumbing were some of the most complicated and frustrating tasks I've ever endured. I'm so glad it's over.<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0012-1.jpg
Here is a drawing of my initial design.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/plumbing02.jpg>br>
I had a wet/dry system that I converted to a sump/fuge.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/Sump.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/sump2-1.jpg<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/005-1.jpg
<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/015-1.jpg
<br>
Bulkhead for return and i added some baffles, a bubble tower and drilled the fuge section that I closed up for another bulkhead. This will direct the overflow from the fuge straight into the return chamber bypassing the skimmer.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/014-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/013-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/016-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/018-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/017-1.jpg
<br>
Here is what I started with.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/IMG00092.jpg
You will have to excuse me I accidentally deleted a lot of the construction pics of the stand. Here is what I have.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/IMG00109.jpg
After I got the sides up I painted the stand with primer and then semi gloss black paint. Here I cut holes in the back for plumbing and the side for fans.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0024-1.jpg<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0044-1.jpg
Here's the fans installed.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0083-1.jpg
<br>
I also added this air vent.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0192-1.jpg
<br>
Doors and Bracket.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0063-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0073-1.jpg
<br>
Finished Product.. Well, atleast that's what I thought..
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0182-1.jpg
I ended up having to drill 4 more holes on the back two for the 3/4" inlet and return on the closed loop and two holes on the bottom left for electrical use..
I must say the planning of the sump/fuge and plumbing were some of the most complicated and frustrating tasks I've ever endured. I'm so glad it's over.<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/0012-1.jpg
Here is a drawing of my initial design.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/plumbing02.jpg>br>
I had a wet/dry system that I converted to a sump/fuge.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/Sump.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/sump2-1.jpg<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/005-1.jpg
<br>
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/015-1.jpg
<br>
Bulkhead for return and i added some baffles, a bubble tower and drilled the fuge section that I closed up for another bulkhead. This will direct the overflow from the fuge straight into the return chamber bypassing the skimmer.
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/014-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/013-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/016-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/018-1.jpg
http://i578.photobucket.com/albums/ss229/Stephen_eddinger2/017-1.jpg
<br>