After hooking up a SCWD a number of poeple asked about install. This is how I did mine but it could be done differently.The two in the front will be chaged to lock line and the pump up graded to a Mag 18 when I can afford it. The heads are adjustable because they are not glued, exterior line are this would be bad not to. A list of parts will follow that I used Thin wall PVC is a must in that it will move more water easy to use and ends can be heated and flared to marry with flex hose.
2-3/4" combination L with 1/2" down adapter
4-1/2" L's
7-3/4" to 1/2" slip adapters
2-1/2" thread to slip adapters
3-3/4" street L's
6-3/4" L's
1-3/4" cap
3-3/4" unions
4-3/4" ball valves
12'-3/4" flex tubing
9-stainless clamps
1-Scwd
1-pump of your choosing
Pump hook up was not in parts list this will very with pump
Ball valve between Pump and Scwd is for throttling if needed.
To match outside and inside edge 3/4" street L and 3/4" L were used.
2-3/4" combination L with 1/2" down adapter
4-1/2" L's
7-3/4" to 1/2" slip adapters
2-1/2" thread to slip adapters
3-3/4" street L's
6-3/4" L's
1-3/4" cap
3-3/4" unions
4-3/4" ball valves
12'-3/4" flex tubing
9-stainless clamps
1-Scwd
1-pump of your choosing
Pump hook up was not in parts list this will very with pump
Ball valve between Pump and Scwd is for throttling if needed.
To match outside and inside edge 3/4" street L and 3/4" L were used.